Type of system: 220V AC/DC

Mechanical protection: YES(under the 2,5m)

Would you buy a pellet stove, but in the place where you should install it does not have an electrical outlet? The problem does not exist because with Next Tape current ports where you want in just 25 minutes and without breaking the walls!

Does it seem impossible? The electrical tape Next Tape conductor is able to manage up to 5 kw and the pellet stove it requires at most 2 for the ignition phase! Next Tape, therefore, not only guarantees the correct operation of the stove, but you also ensures that remnants of it can be connected without the slightest trace of the work performed because you paste directly to the wall and disappears below in a single pass color.

How is it installed?
Where to find it?